Quick answers
What is Saewad Stone Mine?
Saewad Stone Mine is a lapsed mining project in Sarwad, Ratlam, Madhya Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Ajan Belim.
Has it been approved?
No. The application was lapsed on 2 Mar 2025, so it is no longer under consideration.
Where is it?
In Sarwad, Ratlam, Madhya Pradesh.
How big is it?
It has a stated cost of ₹20 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 21 Dec 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Mar 2025 |
| Application filed | 21 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ajan Belim |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Sarwad |
| Taluk / tehsil | Ratlam |
| District | Ratlam |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-04443 |
In context
261 applications in Ratlam since January 2022 are in the same category (Mining): 143 approved, 45 filed or under review, and 73 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is smaller than 69% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Sarwad, Ratlam, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sarwad Stone (Gitti) & M-Sand Quarry — initial checks, 1.7 km away
- Sarwad Stone Mine of Vinodbhai — lapsed, 1.8 km away
- Koteshwar (Imlipada) Tank Project — more information requested, 2.4 km away
- Jio Digital Fiber Pvt Ltd Linear Ofc 5g Project In Row Corridor Of Principal… — more information requested, 3.8 km away
- Pipalkhunta Stone Quarry — environmental approval granted, 9.5 km away
- Pipalkhunta Stone Quarry — more information requested, 9.5 km away
- Pipalkhunta Stone (Gitti) & M-Sand Quarry — under environmental review, 9.6 km away
- Dhikwa-Berchha Road to Ambe Mata Road — more information requested, 10.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.