Quick answers
What is Pardi Stone Quarry?
Pardi Stone Quarry is a lapsed mining project in Pardi, Berasia, Bhopal, Madhya Pradesh. The site covers 5.4 acres.
Who is building it?
The applicant is Nikhil Singh.
Has it been approved?
No. The application was lapsed on 22 Feb 2025, so it is no longer under consideration.
Where is it?
In Pardi, Berasia, Bhopal, Madhya Pradesh.
How big is it?
It has a stated cost of ₹30 lakh and a site of 5.4 acres.
When was it filed?
The application was filed on 26 Nov 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Pardi Stone Quarry
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Feb 2025 |
| Application filed | 26 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Nikhil Singh |
| Land area | 5.4 acres (2.2 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Pardi |
| Taluk / tehsil | Berasia |
| District | Bhopal |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-04487 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 26 Nov 2024 (this page) | Lapsed | 5.4 acres | ₹30 lakh |
| Early planning filed 1 Nov 2023 | Cleared for impact study | 5.4 acres | ₹30 lakh |
In context
173 applications in Bhopal since January 2022 are in the same category (Mining): 87 approved, 30 filed or under review, and 56 withdrawn, lapsed or rejected. The approved ones took a median of 21 days from filing to approval. At 5.4 acres, this one is smaller than 68% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 47.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 20 mining leases have applied within 5 km.
Where it is
Pardi, Berasia, Bhopal, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Pardi Stone Quarry — cleared for impact study, 0 m away
- Pardi Stone Quarry of Vishal Yadav S/o Late Shri Banwari Lal Yadav — under environmental review, 150 m away
- Pardi Stone Quarry of Vishal Yadav S/o Late Shri Banwari Lal Yadav — cleared for impact study, 150 m away
- Pardi stone Quarry — lapsed, 150 m away
- Pardi Stone (Gitti) Quarry — environmental approval granted, 200 m away
- Pardi Stone Quarry — cleared for impact study, 200 m away
- "Pardi Stone Quarry" of Ruma Malik W/o Praween Malik — cleared for impact study, 350 m away
- Pardi Stone Quarry of Ruma Malik — cleared for impact study, 350 m away
More from Nikhil Singh in Bhopal
- Kardai Stone (Gitti & M-Sand) Quarry — environmental approval granted
- Malikhedi Murrum Quarry — lapsed
- Malikhedi Murrum Quarry of Nikhil Kumar Singh — cleared for impact study
- Kardai Stone (Gitti & M-Sand) Quarry — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.