One of 2 filings for this project. The project's main page, with every filing and where each stands: Rewra Limestone Block by M/S Arrow Associates
Project details
| Status | Not approved |
|---|---|
| Status since | 27 Jun 2024 |
| Application filed | 15 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Manoj Rai |
| Land area | 59.1 acres (23.9 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Karhi Pawai |
| Taluk / tehsil | Kothi |
| District | Satna |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-04543 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 18 Jan 2025 | Environmental approval granted | 59.1 acres | ₹50 lakh |
| Ownership transfer filed 15 Mar 2024 (this page) | Not approved | 59.1 acres | ₹50 lakh |
In context
206 applications in Satna since January 2022 are in the same category (Mining): 105 approved, 29 filed or under review, and 72 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 59.1 acres, this one is larger than 73% of them.
No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.
Where it is
Karhi Pawai, Kothi, Satna, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rewra Limestone Mine — environmental approval granted, 0 m away
- Rewra Limestone Block by M/S Arrow Associates — environmental approval granted, 0 m away
- Itoura Limestone Mining with 0.8 MTPA capacity at villages Itoura, Bachwai,… — environmental approval granted, 550 m away
- Bamhore Stone Mine — lapsed, 2.3 km away
- Bamhaur Stone Mine-1.016ha — environmental approval granted, 3.3 km away
- Bamhaur Stone Mine-1.016ha — cleared for impact study, 3.3 km away
- Bamhaur Stone Mine — cleared for impact study, 3.6 km away
- Bamhaur Stone & M. Sand Mine — cleared for impact study, 3.6 km away
More from Manoj Rai in Satna
- Rewra Limestone Mine — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.