What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Bhopal, Madhya Pradesh

Starlight "titania" by Bhopal Redevelopment Realty PVT. LTD.

Starlight "titania" by Bhopal Redevelopment Realty PVT. LTD is an approved residential project in Bhopal, Huzur, Madhya Pradesh. The site covers 2.4 acres. Its stated project cost is ₹75 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 1 Dec 2025).

See it on the live map All projects in Bhopal

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Starlight "titania" by Bhopal Redevelopment Realty PVT. LTD.?

Starlight "titania" by Bhopal Redevelopment Realty PVT. LTD is an approved residential project in Bhopal, Huzur, Madhya Pradesh. The site covers 2.4 acres.

Who is building it?

The applicant is Bhopal Redevelopment Realty Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 1 Dec 2025), as of 27 Nov 2026.

Where is it?

In Bhopal, Huzur, Madhya Pradesh.

How big is it?

It has a stated cost of ₹75 crore and a site of 2.4 acres.

When was it filed?

The application was filed on 30 Apr 2024.

Project details

StatusEnvironmental approval granted
Status since1 Dec 2025
Application filed30 Apr 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantBhopal Redevelopment Realty Private Limited
UseResidential
Land area2.4 acres (1 ha)
Project cost₹75 crore
Village / localityBhopal
Taluk / tehsilHuzur
DistrictBhopal
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-04857

What the filings say

What is planned

Bhopal Redevelopment Realty Private Limited is developing Starlight ‘Titania’, a residential and commercial project in the Shahjahanabad area of Bhopal. The project is part of the Government of Madhya Pradesh's Redevelopment & Re-densification scheme, specifically the Ram Nagar – Pari Bazaar – Bara Mahal Scheme.

The applicant's conceptual plan states that the total scheme covers 10.2065 hectares, divided into Redevelopment Land (5.17 hectares for 460 government housing units and an old age home) and Compensatory Land Parcels (5.0365 hectares for private development). Starlight ‘Titania’ is being developed on Compensatory Land Parcel 2 (CLP-2), which was formerly the site of American Huts and PWD Stores.

The project consists of 136 residential units across five blocks and 22 shops. The residential component includes:

The buildings are planned with a maximum height of 24 metres, comprising a stilt floor and eight upper floors. The total construction area is 30,634.02 square metres.

Layout and design

The project site occupies a plot area of 9,600 square metres. The net planning area, after road widening and master plan road requirements, is 9,362.7 square metres. The layout includes a central podium garden and various amenities including a clubhouse and a badminton court.

ItemDetail
Total Plot Area9,600 sq.m.
Net Planning Area9,362.7 sq.m.
Total Construction Area30,634.02 sq.m.
Permissible FAR1.50
Proposed FAR1.25
Ground Coverage2,808.84 sq.m. (30%)
Community Open Space1,290.20 sq.m. (13.80%)
Total Parking Proposed245 ECS
Maximum Building Height24 m

Land and surroundings

The site is located at Khasra numbers 88, 89 (part), 90 (part), and 92 (part) in Village Bhopal, Huzur Tehsil. It is situated near Motia Talab and the Taj Ul Masajid. The project site is approximately 0.2 km from National Highway 86 and 2.5 km from Bhopal Junction railway station.

Environmental sensitivity maps indicate the site is 0.5 km from Bara Talao and 2.8 km from Van Vihar National Park. The applicant reports that 62 existing trees on the site were cut down after obtaining permission from the Bhopal Municipal Corporation. To compensate, the landscape plan proposes planting approximately 465 trees of native species.

Water, power and access

The total water requirement for the project is estimated at 162.6 Kilo Litres per Day (KLD). Fresh water demand of 134 KLD will be met through the Bhopal Municipal Corporation supply. During the construction phase, water will be sourced from private tankers.

Power demand is estimated at 799 KVA, to be drawn from the Madhya Pradesh Electricity Board (MPEB). A 125 KVA diesel generator set is proposed for backup power. Access to the site is provided via a 24-metre wide road.

Environmental safeguards

A captive Sewage Treatment Plant (STP) with a capacity of 110.36 KLD will be installed using Moving Bed Bio-film Reactor (MBBR) technology. The plant is designed to treat 110.36 KLD of influent, producing 99.3 KLD of treated effluent. Of this, 19 KLD will be reused for irrigation and 9.6 KLD for common area washing, with the remaining 70.7 KLD discharged into the municipal sewer line.

For rainwater harvesting, the applicant proposes two recharge pits, each with a capacity of 12 cubic metres. Solid waste generation is estimated at 497.1 kg per day, including 198.84 kg of biodegradable waste and 298.26 kg of non-biodegradable waste. Biodegradable waste will be collected and disposed of in municipal bins. The environmental management budget includes –8.81 lakh in capital costs for the construction phase and –65.22 lakh for the operational phase.

Bhopal Redevelopment Realty Starlight "titania" site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Bhopal Redevelopment Realty Starlight "titania": Approved T & CP Layout: plot boundaries and road widening (preview)🔒 Sign in free to see it
Approved T & CP Layout: plot boundaries and road widening
Bhopal Redevelopment Realty Starlight "titania": Google Image: project location relative to Motia Talab and Taj Ul Masajid (preview)🔒 Sign in free to see it
Google Image: project location relative to Motia Talab and Taj Ul Masajid
Bhopal Redevelopment Realty Starlight "titania": Podium Landscape Plan: building blocks A-E and garden layout (preview)🔒 Sign in free to see it
Podium Landscape Plan: building blocks A-E and garden layout
Bhopal Redevelopment Realty Starlight "titania": Section and Elevation: building height and floor levels (preview)🔒 Sign in free to see it
Section and Elevation: building height and floor levels

In context

44 applications in Bhopal since January 2022 are in the same category (Buildings & townships): 30 approved, 9 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 2.4 acres, this one is smaller than 91% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bhopal, Huzur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.