Quick answers
What is Manganese Ore Beneficiation Plant (Capacity-0.5 MTPA)?
Manganese Ore Beneficiation Plant (Capacity-0.5 MTPA) is an approved mining project in Selwa, Katangi, Balaghat, Madhya Pradesh. The site covers 7.6 acres.
Who is building it?
The applicant is Magnes Ore Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Jul 2024), as of 27 Nov 2026.
Where is it?
In Selwa, Katangi, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹5 crore and a site of 7.6 acres.
When was it filed?
The application was filed on 8 Feb 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Jul 2024 |
| Application filed | 8 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Magnes Ore Private Limited |
| Land area | 7.6 acres (3.1 ha) |
| Project cost | ₹5 crore |
| Village / locality | Selwa |
| Taluk / tehsil | Katangi |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-05026 |
In context
204 applications in Balaghat since January 2022 are in the same category (Mining): 113 approved, 51 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 7.6 acres, this one is smaller than 68% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Selwa, Katangi, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bahkal Sand Quarry — environmental approval granted, 5.1 km away
- Paunia and Manegaon Manganese Quarry — cleared for impact study, 5.3 km away
- Paunia and Manegaon Manganese Mine — lapsed, 5.3 km away
- Amended Bharat Net/BSNL Linear UG OFC laying Project in KATANGI Block, DFO SOUTH — lapsed, 6.3 km away
- Pauniya Manganese Ore Mining Project — under environmental review, 6.4 km away
- Pauniya Manganese Ore Mining Project — under environmental review, 6.4 km away
- Pauniya Manganese Ore Mining Project — cleared for impact study, 6.4 km away
- Kalgaon Sand Quarry — environmental approval granted, 6.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.