One of 3 filings for this project. The project's main page, with every filing and where each stands: NAVAPADA STONE MINE-1.0ha,( Production-25,650Cum/Year)
Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Jun 2025 |
| Application filed | 17 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Alkesh Bakaliya |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹80 lakh |
| Village / locality | Nawapara |
| Taluk / tehsil | Meghnagar |
| District | Jhabua |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-05039 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 17 Apr 2025 | Cleared for impact study | 2.5 acres | ₹80 lakh |
| New project filed 17 Feb 2024 (this page) | Lapsed | 2.5 acres | ₹80 lakh |
| Early planning filed 12 Dec 2023 | Lapsed | 2.5 acres | ₹80 lakh |
In context
65 applications in Jhabua since January 2022 are in the same category (Mining): 28 approved, 4 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 42 days from filing to approval. At 2.5 acres, this one is smaller than 92% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 14.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Nawapara, Meghnagar, Jhabua, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- NAVAPADA STONE MINE-1.0ha,( Production-25,650Cum/Year) — cleared for impact study, 0 m away
- Navapada Stone Mine-1.0ha,( Production-25,650Cum/Year) — lapsed, 0 m away
- NAVAPADA STONE MINE-1.0ha,( Production-9,336.35Cum/Year) — cleared for impact study, 50 m away
- Navapada Stone Mine-1.0ha,( Production-9,336.35Cum/Year) — lapsed, 50 m away
- Navapada Stone Mine-1.0ha,( Production-9,336.35Cum/Year) — lapsed, 50 m away
- Navapada Stone Mine — cleared for impact study, 250 m away
- Navapada Stone Deposit — lapsed, 300 m away
- Navapada Stone Mine — lapsed, 300 m away
More from Alkesh Bakaliya in Jhabua
- NAVAPADA STONE MINE-1.0ha,( Production-9,336.35Cum/Year) — cleared for impact study
- Navapada Stone Mine-1.0ha,( Production-9,336.35Cum/Year) — lapsed
- Navapada Stone Mine-1.0ha,( Production-9,336.35Cum/Year) — lapsed
- Bheemfaliya Crusher Stone Mine — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.