One of 2 filings for this project. The project's main page, with every filing and where each stands: Barandwa Stone Quarry
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Feb 2025 |
| Application filed | 11 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Raghvendra Sengar |
| Land area | 4.3 acres (1.8 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Barandwa |
| Taluk / tehsil | Tarana |
| District | Ujjain |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-05131 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Dec 2024 (this page) | Lapsed | 4.3 acres | ₹30 lakh |
| New project filed 11 Dec 2024 | Lapsed | 7.4 acres | ₹40 lakh |
In context
454 applications in Ujjain since January 2022 are in the same category (Mining): 252 approved, 63 filed or under review, and 139 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.3 acres, this one is smaller than 69% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Barandwa, Tarana, Ujjain, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kanasiya Gitti and M-sand Quarry project — environmental approval granted, 2.5 km away
- Kanasiya Stone (Gitti) Quarry — lapsed, 2.5 km away
- Proposed 3.0 GW + 3.0 GW Solar Cell and 2.0 GW Solar Module Production Facility — under environmental review, 3.2 km away
- Industrial Park Maksi (Phase-II) — initial checks, 3.3 km away
- Industrial Park Maksi (Phase-II) — cleared for impact study, 3.3 km away
- Proposed 4 GW Solar Module Plant at Khasra No-1508/2/2, 1508/3,1508/4/2,1508/1… — under environmental review, 3.3 km away
- Barandwa Murrum and Stone Quarry For Gitti & M-Sand — environmental approval granted, 3.4 km away
- Barandwa Murrum and Stone Quarry For Gitti & M-Sand — cleared for impact study, 3.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.