What is Developing? Open the mapMap

LapsedMining · Alirajpur, Madhya Pradesh

Re-Appraisal of EC Granted from DEIAA (District Alirajpur) To SEIAA (Madhya Pradesh) Existing Mine Ambaja Stone Quarry; Quarry Lease Area- 2.00 ha, Production Capacity-50,000 Cubic meter per year at Khasra No.-120, 123, Village-Ambaja, Tehsil-Sondwa, District-Alirajpur, State-Madhya Pradesh, by Sharmi Pachaya

Re-Appraisal of EC Granted from DEIAA (District Alirajpur) To SEIAA (Madhya Pradesh) Existing Mine Ambaja Stone Quarry; Quarry Lease Area- 2.00 ha, Production Capacity-50,000 Cubic meter per year at Khasra No.-120, 123, Village-Ambaja, Tehsil-Sondwa, District-Alirajpur, State-Madhya Pradesh, by Sharmi Pachaya is a lapsed mining project in Ambaja, Alirajpur, Madhya Pradesh. The site covers 4.9 acres. Its stated project cost is ₹1.1 crore. As of 27 Nov 2026, its status is “Lapsed” (since 15 Apr 2025).

See it on the live map All projects in Alirajpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Re-Appraisal of EC Granted from DEIAA (District Alirajpur) To SEIAA (Madhya Pradesh) Existing Mine Ambaja Stone Quarry; Quarry Lease Area- 2.00 ha, Production Capacity-50,000 Cubic meter per year at Khasra No.-120, 123, Village-Ambaja, Tehsil-Sondwa, District-Alirajpur, State-Madhya Pradesh, by Sharmi Pachaya is a lapsed mining project in Ambaja, Alirajpur, Madhya Pradesh. The site covers 4.9 acres.

Who is building it?

The applicant is Sharmi Pachaya.

Has it been approved?

No. The application was lapsed on 15 Apr 2025, so it is no longer under consideration.

Where is it?

In Ambaja, Alirajpur, Madhya Pradesh.

How big is it?

It has a stated cost of ₹1.1 crore and a site of 4.9 acres.

When was it filed?

The application was filed on 21 Feb 2025.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Re-Appraisal of EC Granted from DEIAA (District Alirajpur) To SEIAA (Madhya Pradesh)…

Project details

StatusLapsed
Status since15 Apr 2025
Application filed21 Feb 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantSharmi Pachaya
Land area4.9 acres (2 ha)
Project cost₹1.1 crore
Village / localityAmbaja
Taluk / tehsilAlirajpur
DistrictAlirajpur
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-05340

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 2 Sept 2026More information requested4.9 acres₹1.1 crore
Early planning filed 17 Apr 2025Cleared for impact study4.9 acres₹1.1 crore
New project filed 21 Feb 2025 (this page)Lapsed4.9 acres₹1.1 crore

In context

64 applications in Alirajpur since January 2022 are in the same category (Mining): 39 approved, 10 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 4.9 acres, this one is smaller than 67% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 14.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.

Where it is

Ambaja, Alirajpur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sharmi Pachaya in Alirajpur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.