Quick answers
What is Bhadora Flagstone Quarry?
Bhadora Flagstone Quarry is an approved mining project in Bharora, Pichhore, Shivpuri, Madhya Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Shobha Gupta.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Apr 2026), as of 27 Nov 2026.
Where is it?
In Bharora, Pichhore, Shivpuri, Madhya Pradesh.
How big is it?
It has a stated cost of ₹20 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 18 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Apr 2026 |
| Application filed | 18 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shobha Gupta |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Bharora |
| Taluk / tehsil | Pichhore |
| District | Shivpuri |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-05501 |
In context
149 applications in Shivpuri since January 2022 are in the same category (Mining): 88 approved, 29 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.9 acres, this one is smaller than 87% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Bharora, Pichhore, Shivpuri, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bhadora Flagstone Quarry — environmental approval granted, 300 m away
- Bhadora Flagstone Quarry — environmental approval granted, 750 m away
- Flagstone Quarry — environmental approval granted, 900 m away
- Flagstone Quarry — cleared for impact study, 900 m away
- Flagstone Quarry — environmental approval granted, 1 km away
- Flagstone Quarry — cleared for impact study, 1 km away
- Bhadora Flagstone, Khanda/ Dhoka Quarry — under environmental review, 1.4 km away
- 33KV Line Interconnection Mada Under Rdss Loss Reduction Scheme — lapsed, 3.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.