One of 2 filings for this project. The project's main page, with every filing and where each stands: Temla Kalan Murrum Quarry
Project details
| Status | Withdrawn |
|---|---|
| Status since | 27 Jan 2025 |
| Application filed | 27 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rajendra Singh Rajput |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Temla Kalan |
| Taluk / tehsil | Seoni-Malwa |
| District | Hoshangabad |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-05561 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 May 2025 | Lapsed | 4.9 acres | ₹20 lakh |
| New project filed 27 Jan 2025 (this page) | Withdrawn | 4.9 acres | ₹20 lakh |
In context
174 applications in Hoshangabad since January 2022 are in the same category (Mining): 156 approved, 8 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 25 days from filing to approval. At 4.9 acres, this one is smaller than 93% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Temla Kalan, Seoni-Malwa, Hoshangabad, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Temla Kalan Murrum Quarry — lapsed, 0 m away
- Temlakalan Murrum Quarry — cleared for impact study, 300 m away
- Temlakalan Murrum Quarry — environmental approval granted, 1.4 km away
- Dhamasa Murrum Quarry — environmental approval granted, 1.7 km away
- Gondikharar Murrum Mine — environmental approval granted, 1.7 km away
- Gondikharar Crusher Stone Quarry — under environmental review, 1.7 km away
- Gondikharar Stone Quarry — environmental approval granted, 1.8 km away
- Gondi Kharar Murrum Quarry — environmental approval granted, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.