Quick answers
What is this project?
"Katamal Dolomite Mining Project" Project Location- At Khasra No. 574, 596, 597, 598, 599, 602, 603, 604, 605, 606 & 731 Village: Katamal, Tehsil- Bichhiya & District- Mandla State- Madhya Pradesh Area: 2.580 Ha is an approved mining project in Kata Mal., Bichhiya, Mandla, Madhya Pradesh. The site covers 6.4 acres.
Who is building it?
The applicant is Sheela Patle.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 17 Jul 2026), as of 27 Nov 2026.
Where is it?
In Kata Mal., Bichhiya, Mandla, Madhya Pradesh.
How big is it?
It has a stated cost of ₹80 lakh and a site of 6.4 acres.
When was it filed?
The application was filed on 8 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 17 Jul 2026 |
| Application filed | 8 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sheela Patle |
| Land area | 6.4 acres (2.6 ha) |
| Project cost | ₹80 lakh |
| Village / locality | Kata Mal. |
| Taluk / tehsil | Bichhiya |
| District | Mandla |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-05723 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Dec 2025 (this page) | Environmental approval granted | 6.4 acres | ₹80 lakh |
| Early planning filed 29 Apr 2025 | Cleared for impact study | 6.4 acres | ₹80 lakh |
In context
180 applications in Mandla since January 2022 are in the same category (Mining): 102 approved, 22 filed or under review, and 56 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 6.4 acres, this one is larger than 53% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 36.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 59 mining leases have applied within 5 km.
Where it is
Kata Mal., Bichhiya, Mandla, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Katamal Dolomite Mining Project" Project Location- At Khasra No. 574, 596,… — cleared for impact study, 0 m away
- Katamal Dolomite Quarry — withdrawn, 100 m away
- Katamal Dolomite Quarry — environmental approval granted, 100 m away
- Kata Mal Dolomite Quarry Expansion Project — lapsed, 250 m away
- Proposed Katamal Dolomite Mines (3.150 ha) is by the M/s Gupta Stone Mines… — cleared for impact study, 350 m away
- KATA MAL-1 SAND QUARRY (3.00Ha) — more information requested, 650 m away
- KATA MAL-1 SAND QUARRY (3.00Ha) — lapsed, 650 m away
- KAMTA MAL-1 SAND QUARRY (3.00Ha) — withdrawn, 650 m away
More from Sheela Patle in Mandla
- Kata Mal Dolomite Quarry Expansion Project — lapsed
- Katamal Dolomite Quarry — withdrawn
- Katamal Dolomite Quarry — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.