Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 8 May 2025 |
| Application filed | 28 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sharad Kumar Singh |
| Land area | 4.5 acres (1.8 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Khajuriha |
| Taluk / tehsil | Majhauli |
| District | Sidhi |
| State | Madhya Pradesh |
| Location from | Site area on record |
| Our reference | WID-MP-05949 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 28 Apr 2025 (this page) | Cleared for impact study | 4.5 acres | ₹25 lakh |
| New project filed 26 Nov 2024 | Lapsed | 4.5 acres | ₹25 lakh |
In context
105 applications in Sidhi since January 2022 are in the same category (Mining): 43 approved, 12 filed or under review, and 50 withdrawn, lapsed or rejected. The approved ones took a median of 18 days from filing to approval. At 4.5 acres, this one is smaller than 71% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 24.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Khajuriha, Majhauli, Sidhi, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Katarwar Stone Mine-1.810ha — lapsed, 0 m away
- Katarwar Stone Mine-1.660ha — cleared for impact study, 150 m away
- Katarwar Stone Mine-1.660ha — lapsed, 150 m away
- Khajuriha Stone Mine-1.55ha. — cleared for impact study, 250 m away
- Katarwar Stone Mine-2.40ha — cleared for impact study, 300 m away
- Katarwar Stone Mine — lapsed, 300 m away
- PMJANMAN Road L-088 Bhadoura Khokhara (Badakadol) Road to Gurh Tola Baiga Basti — under wildlife review, 4 km away
- Gond Major Irrigation Project — cleared for impact study, 5.1 km away
More from Sharad Kumar Singh in Sidhi
- Katarwar Stone Mine-1.660ha — cleared for impact study
- Katarwar Stone Mine-1.660ha — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.