Quick answers
What is Sikandarabad Stone Quarry?
Sikandarabad Stone Quarry is a proposed mining project in Sikandrabad, Huzur, Bhopal, Madhya Pradesh. The site covers 4.8 acres.
Who is building it?
The applicant is Preeti Agrawal.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 25 Apr 2025), as of 27 Nov 2026.
Where is it?
In Sikandrabad, Huzur, Bhopal, Madhya Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 4.8 acres.
When was it filed?
The application was filed on 25 Apr 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 25 Apr 2025 |
| Application filed | 25 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Preeti Agrawal |
| Land area | 4.8 acres (1.9 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Sikandrabad |
| Taluk / tehsil | Huzur |
| District | Bhopal |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-05995 |
In context
173 applications in Bhopal since January 2022 are in the same category (Mining): 87 approved, 30 filed or under review, and 56 withdrawn, lapsed or rejected. The approved ones took a median of 21 days from filing to approval. At 4.8 acres, this one is smaller than 84% of them.
No other mining lease on record is within 500 m of this site; 20 have applied within 5 km.
Where it is
Sikandrabad, Huzur, Bhopal, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sikandarabad Stone Quarry — cleared for impact study, 300 m away
- Sikandarabad Stone Quarry — lapsed, 300 m away
- Sarvar Stone Quarry — initial checks, 1.6 km away
- Sarvar Stone Quarry — cleared for impact study, 1.6 km away
- Sarvar Stone Quarry — lapsed, 1.6 km away
- Sarvar Stone Quarry — more information requested, 1.6 km away
- Chhapri Stone Quarry — cleared for impact study, 1.6 km away
- Chhapri Stone Quarry — cleared for impact study, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.