Quick answers
What is this project?
Common Bio-Medical Waste Treatment Facility at Mahu, Thana/Th. Raghogarh, District Guna, Madhya Pradesh by M/s SHUDDHAVITA ECO SOLUTIONS PRIVATE LIMITED is a lapsed waste management project in Mahu, Raghogarh, Guna, Madhya Pradesh. The site covers 2 acres.
Who is building it?
The applicant is Shuddhavita Eco Solutions Private Limited.
Has it been approved?
No. The application was lapsed on 18 Dec 2025, so it is no longer under consideration.
Where is it?
In Mahu, Raghogarh, Guna, Madhya Pradesh.
How big is it?
It has a stated cost of ₹70 lakh and a site of 2 acres.
When was it filed?
The application was filed on 17 Nov 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Dec 2025 |
| Application filed | 17 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Shuddhavita Eco Solutions Private Limited |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹70 lakh |
| Village / locality | Mahu |
| Taluk / tehsil | Raghogarh |
| District | Guna |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06108 |
In context
5 applications in Guna since January 2022 are in the same category (Waste management): 2 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahu, Raghogarh, Guna, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Development of Common Bio-Medical Waste Treatment & Recycling Facility — cleared for impact study, 50 m away
- Rajghat Multivillage Scheme — forest land use approved, 3.7 km away
- RAJGHAT-Multi village Scheme — forest land use approved, 7.9 km away
- Bapcha Lahariya Sand Quarry — environmental approval granted, 8 km away
- Khatkiya (Kalapatha) Sand Quarry — environmental approval granted, 11 km away
- Diversion of Forest Land for Construction of Mobile Tower at Sawan Bhadon — lapsed, 11.1 km away
- Diversion of Forest Land for Construction of Mobile Tower at Bargiya Kheda — lapsed, 11.4 km away
- DHADHONYA CRUSHER STONE QUARRY, Area- 2.0 Ha, Khasra No 46/1/Ka/1,… — under environmental review, 11.9 km away
More from Shuddhavita Eco Solutions Private Limited in Guna
- Development of Common Bio-Medical Waste Treatment & Recycling Facility — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.