One of 2 filings for this project. The project's main page, with every filing and where each stands: Pipla Kanhan Sand Quarry
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Sept 2025 |
| Application filed | 24 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jitendra Chandel |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹45 lakh |
| Village / locality | Piplakanhan |
| Taluk / tehsil | Sausar |
| District | Chhindwara |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06227 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Apr 2025 (this page) | Lapsed | 7.4 acres | ₹45 lakh |
| Early planning filed 30 Jan 2024 | Cleared for impact study | 7.4 acres | ₹45 lakh |
In context
144 applications in Chhindwara since January 2022 are in the same category (Mining): 77 approved, 18 filed or under review, and 49 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.4 acres, this one is larger than 51% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Piplakanhan, Sausar, Chhindwara, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Pipla Kanhan Sand Quarry — cleared for impact study, 0 m away
- Palaspani Sand Quarry — environmental approval granted, 700 m away
- Palaspani Sand Quarry — cleared for impact study, 700 m away
- Expansion of Grain based Distillery from 200 KLPD to 540 KLPD including 200… — cleared for impact study, 2 km away
- Rohna Sand Quarry (Quarry lease); Area 1.10 Ha, Production 19800 m3/year, At… — environmental approval granted, 2.8 km away
- Baradevi Khapa Sand Quarry — environmental approval granted, 3.6 km away
- Baradevi Khapa Sand Quarry — cleared for impact study, 3.6 km away
- Kajalwani Sand Quarry — environmental approval granted, 6.7 km away
More from Jitendra Chandel in Chhindwara
- Sayra Sand Quarry — environmental approval granted
- Palaspani Sand Quarry — environmental approval granted
- Malegaon Sand Quarry — environmental approval granted
- Lohani Sand Quarry — environmental approval granted
- Baradevi Khapa Sand Quarry — environmental approval granted
- Kajalwani Sand Quarry — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.