Quick answers
What is Chapda Stone Quarry(Temporary Permit)?
Chapda Stone Quarry(Temporary Permit) is a lapsed mining project in Chapra, Bagli, Dewas, Madhya Pradesh. The site covers 7.4 acres.
Who is building it?
The applicant is Shreeji Infrastructure India Private Limited.
Has it been approved?
No. The application was lapsed on 18 Oct 2025, so it is no longer under consideration.
Where is it?
In Chapra, Bagli, Dewas, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 7.4 acres.
When was it filed?
The application was filed on 3 Sept 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Chapda Stone Quarry(Temporary Permit)
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Oct 2025 |
| Application filed | 3 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Shreeji Infrastructure India Private Limited |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Chapra |
| Taluk / tehsil | Bagli |
| District | Dewas |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06690 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Nov 2026 | Initial checks | 7.4 acres | ₹1.2 crore |
| Validity extension filed 3 Sept 2025 (this page) | Lapsed | 7.4 acres | ₹1.2 crore |
| New project filed 12 Oct 2023 | Environmental approval granted | 7.4 acres | ₹1.2 crore |
In context
215 applications in Dewas since January 2022 are in the same category (Mining): 103 approved, 47 filed or under review, and 65 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 7.4 acres, this one is smaller than 65% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Chapra, Bagli, Dewas, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chapda Stone Quarry (Temporary Permit) — initial checks, 0 m away
- Chapda Stone Quarry(Temporary Permit) — environmental approval granted, 0 m away
- Chapda Stone Quarry — environmental approval granted, 2 km away
- Chapda Stone Quarry — cleared for impact study, 2 km away
- Chapda Stone Quarry — lapsed, 2 km away
- Chapda Stone Quarry — environmental approval granted, 2.2 km away
- Chapda Stone Quarry — cleared for impact study, 2.2 km away
- Chapda Stone Quarry — lapsed, 2.2 km away
3 Shreeji Infrastructure projects in Dewas
All 6 Shreeji Infrastructure projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.