One of 2 filings for this project. The project's main page, with every filing and where each stands: Malakhedi Murrum Mining Project
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Apr 2025 |
| Application filed | 21 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Preeti Yadav |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Malakheri |
| Taluk / tehsil | Sawer |
| District | Indore |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06752 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Mar 2025 (this page) | Lapsed | 9.9 acres | ₹10 lakh |
| Early planning filed 21 Mar 2025 | Cleared for impact study | 9.9 acres | ₹10 lakh |
In context
129 applications in Indore since January 2022 are in the same category (Mining): 70 approved, 16 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 13 days from filing to approval. At 9.9 acres, this one is larger than 73% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 43.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Malakheri, Sawer, Indore, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Malakhedi Murrum Mining Project — cleared for impact study, 0 m away
- Malakhedi Murram Quarry — environmental approval granted, 300 m away
- Malakhedi Stone & M-Sand Mine — environmental approval granted, 350 m away
- Malakhedi Stone & M-Sand Mine — cleared for impact study, 350 m away
- Malakhedi Murrum, Stone(Gitti) and M-sand Quarry — cleared for impact study, 350 m away
- Malakhedi Murrum, Stone(Gitti) and M-sand Quarry — under environmental review, 350 m away
- 4-lane Greenfield Indore-Ujjain Road Starting from Km. 0+000 near Pitra Parvat… — cleared for impact study, 2.7 km away
- Hatuniya Stone Quarry — lapsed, 16.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.