Quick answers
What is Badegaon Crusher Stone Quarry Project?
Badegaon Crusher Stone Quarry Project is an approved mining project in Baregaon, Multai, Betul, Madhya Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Umesh Sarode.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Dec 2025), as of 27 Nov 2026.
Where is it?
In Baregaon, Multai, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹40 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 18 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Dec 2025 |
| Application filed | 18 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Umesh Sarode |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Baregaon |
| Taluk / tehsil | Multai |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06907 |
In context
166 applications in Betul since January 2022 are in the same category (Mining): 118 approved, 16 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 4.9 acres, this one is smaller than 51% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Baregaon, Multai, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chandora Khurd Crusher Stone Quarry — under environmental review, 1.3 km away
- Temjhira Stone Quarry — environmental approval granted, 1.3 km away
- Deori Stone Quarry — environmental approval granted, 2.2 km away
- Dewari Stone Quarry — environmental approval granted, 2.6 km away
- 33/11 KV Barai Substation — lapsed, 4 km away
- New Janpad Panchayat Building Construction Multai At Kamath, District Betul — under forest review, 4.8 km away
- Hardoli Buzurg Stone Quarry — under environmental review, 8.4 km away
- Hardoli Stone Quarry — environmental approval granted, 8.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.