Quick answers
What is this project?
Nataram Stone, Murram, M-Sand Quarry; Quarry Lease Area- 3.0 ha, Production Capacity- 33,598 Cubic meter per year at Khasra No.- 665/2, Village- Nataram, Tehsil- Sitamau, District- Mandsaur, State- Madhya Pradesh by Mr. Madhusudan Patidar is a lapsed mining project in Nata Ram, Sitamau, Mandsaur, Madhya Pradesh. The site covers 7.4 acres.
Who is building it?
The applicant is Madhu Patidar.
Has it been approved?
No. The application was lapsed on 2 Sept 2026, so it is no longer under consideration.
Where is it?
In Nata Ram, Sitamau, Mandsaur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹61 lakh and a site of 7.4 acres.
When was it filed?
The application was filed on 30 Jul 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Sept 2026 |
| Application filed | 30 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Madhu Patidar |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹61 lakh |
| Village / locality | Nata Ram |
| Taluk / tehsil | Sitamau |
| District | Mandsaur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06917 |
In context
252 applications in Mandsaur since January 2022 are in the same category (Mining): 130 approved, 38 filed or under review, and 84 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 7.4 acres, this one is larger than 72% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Nata Ram, Sitamau, Mandsaur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s A T S Alloys Private Limited — under environmental review, 2.9 km away
- Industrial project by M/s A T S Alloys Private Limited — cleared for impact study, 2.9 km away
- Bilantri Stone Gitti Quarry — lapsed, 5.7 km away
- Sitamau Stone Quarry — lapsed, 5.9 km away
- Sitamau Stone (Gitti) Quarry — under environmental review, 6.1 km away
- Sitamahu Stone Gitti Quarry — cleared for impact study, 6.2 km away
- Sitamahu Stone Gitti Quarry — lapsed, 6.2 km away
- Sitamau Stone Quarry — lapsed, 6.2 km away
More from Madhu Patidar in Mandsaur
- Arniyagurjar Stone Quarry; Quarry Lease Area- 4.0 ha, Production Capacity-… — under environmental review
- Arniyagurjar Stone Quarry; Quarry Lease Area- 2.0 ha, Production Capacity-… — lapsed
- Arniyagurjar Stone Quarry; Quarry Lease Area- 4.0 ha, Production Capacity-… — cleared for impact study
- Re-Appraisal of EC Granted from DEIAA (Mandsaur) To SEIAA (Madhya Pradesh)… — cleared for impact study
- Re-Appraisal of EC Granted from DEIAA (Mandsaur) To SEIAA (Madhya Pradesh)… — cleared for impact study
- Re-Appraisal of EC Granted from DEIAA (Mandsaur) To SEIAA (Madhya Pradesh)… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.