Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 17 Apr 2025 |
| Application filed | 11 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Naveen Agrawal |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Malakshakheri |
| Taluk / tehsil | Maheshwar |
| District | West Nimar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06919 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 11 Apr 2025 (this page) | Cleared for impact study | 9.9 acres | ₹15 lakh |
| New project filed 24 May 2024 | Lapsed | 9.9 acres | ₹12 lakh |
In context
175 applications in West Nimar since January 2022 are in the same category (Mining): 106 approved, 19 filed or under review, and 50 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9.9 acres, this one is larger than 74% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Malakshakheri, Maheshwar, West Nimar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Malshakhedi Crusher Stone Deposit — lapsed, 0 m away
- Malshakhedi Stone Quarry — under environmental review, 1.7 km away
- Malshakhedi Murrum Quarry — environmental approval granted, 1.8 km away
- Thanganv Murrum Quarry — under environmental review, 2.4 km away
- Khariya Stone Quarry — environmental approval granted, 2.9 km away
- Makadkheda 2 Sand Quarry — environmental approval granted, 4.3 km away
- Badgaon (1) Sand Quarry- (Khodu-Bharu) — cleared for impact study, 5.2 km away
- Badgaon (1) Sand Quarry- (Khodu-Bharu) — environmental approval granted, 5.2 km away
More from Naveen Agrawal in West Nimar
- Lepa Soil Quarry — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.