Project details
| Official title | Expansion of Patharia Limestone Mine, M. L No. 917 & Area- 1247.267 ha for production Capacity from 4.50 MTPA (Screened Limestone) to 5.4 MTPA (Screened Limestone) (ROM 6.75 MTPA) along with existing Crusher 1150 TPH capacity |
|---|---|
| Status | Lapsed |
| Status since | 11 Oct 2026 |
| Application filed | 11 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Heidelbergcement India Limited |
| Land area | 3,082.1 acres (1,247.3 ha) |
| Project cost | ₹398.5 crore |
| Village / locality | Jagthar |
| Taluk / tehsil | Patharia |
| District | Damoh |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-06944 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 7 Oct 2026 | Under environmental review | 3,082.1 acres | ₹398.5 crore |
| Early planning filed 11 Apr 2025 (this page) | Lapsed | 3,082.1 acres | ₹398.5 crore |
In context
56 applications in Damoh since January 2022 are in the same category (Mining): 38 approved, 9 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 3,082.1 acres, this one is larger than 91% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Jagthar, Patharia, Damoh, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Patharia Limestone Mine, M. L No. 917 & Area- 1247.267 ha for… — under environmental review, 0 m away
- Sukha Satpara limestone block (Area 216 ha) with limestone production capacity… — environmental approval granted, 2.9 km away
- Sukha Satpara limestone block (Area 216 ha) with limestone production capacity… — cleared for impact study, 2.9 km away
- Gungrakalan Metal Stone Deposit — lapsed, 9.1 km away
- Gudha Limestone And Dolomite Block — environmental approval granted, 10.4 km away
- Gudha Limestone And Dolomite Block — cleared for impact study, 10.4 km away
- Bharti Airtel ltd. 5G OFC Project Makroniya-Patharia-Hatta route DFO Damoh — forest land use approved, 14.1 km away
- B-Panch-A_fc — lapsed, 14.8 km away
More from Heidelbergcement India Limited in Damoh
- Sukha Satpara limestone block (Area 216 ha) with limestone production capacity… — environmental approval granted
- Prior Environment Clearance for proposed Capacity Expansion in Existing Cement… — initial checks
- Clinker Production Expansion from 3.1 Million TPA to 3.72 Million TPA (20%… — lapsed
- Sukha Satpara limestone block (Area 216 ha) with limestone production capacity… — cleared for impact study
6 Heidelbergcement India projects in Damoh
All 8 Heidelbergcement India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.