Quick answers
What is Gadariya Stone Quarry M/s Gloabal Infrastructure Ltd.?
Gadariya Stone Quarry M/s Gloabal Infrastructure Ltd is an approved mining project in Gareriya, Singrauli, Madhya Pradesh. The site covers 4.6 acres.
Who is building it?
The applicant is Global Infrastructure.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Sept 2025), as of 27 Nov 2026.
Where is it?
In Gareriya, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹45 lakh and a site of 4.6 acres.
When was it filed?
The application was filed on 20 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Sept 2025 |
| Application filed | 20 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Global Infrastructure |
| Land area | 4.6 acres (1.9 ha) |
| Project cost | ₹45 lakh |
| Village / locality | Gareriya |
| Taluk / tehsil | Singrauli |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07084 |
In context
268 applications in Singrauli since January 2022 are in the same category (Mining): 152 approved, 40 filed or under review, and 76 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.6 acres, this one is smaller than 86% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 30.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.
Where it is
Gareriya, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gadariya Metal Stone Mine — lapsed, 150 m away
- Gadariya Metal Stone Deposit Of M/s Global Infrastructure — cleared for impact study, 150 m away
- Gadariya Stone Quarry — under environmental review, 300 m away
- Gadariya Metal Stone Deposit — lapsed, 400 m away
- Establishment of 2.48 MTPA Wet type (Heavy Media) Coal Washery — environmental approval granted, 550 m away
- Establishment of 2.48 MTPA Wet type (Heavy Media) Coal Washery — cleared for impact study, 550 m away
- Phulwari Stone Quarry — environmental approval granted, 850 m away
- Phulwari Stone Quarry — cleared for impact study, 850 m away
More from Global Infrastructure in Singrauli
- Gadariya Metal Stone Deposit Of M/s Global Infrastructure — cleared for impact study
- Gadariya Metal Stone Mine — lapsed
- Gadariya Metal Stone Deposit — lapsed
4 Global Infrastructure projects in Singrauli
All 5 Global Infrastructure projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.