Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Jan 2026 |
| Application filed | 17 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Himmat Sisodia |
| Land area | 18.9 acres (7.7 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Gangat Khedi |
| Taluk / tehsil | Maheshwar |
| District | West Nimar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07157 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Jan 2025 (this page) | Environmental approval granted | 18.9 acres | ₹25 lakh |
| Early planning filed 29 Jan 2024 | Cleared for impact study | 18.9 acres | ₹25 lakh |
In context
175 applications in West Nimar since January 2022 are in the same category (Mining): 106 approved, 19 filed or under review, and 50 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 18.9 acres, this one is larger than 89% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Gangat Khedi, Maheshwar, West Nimar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gangatkhedi – Sand Quarry — cleared for impact study, 0 m away
- Kapasthal Sand Quarry — environmental approval granted, 700 m away
- Muralla Stone Quarry — lapsed, 5.5 km away
- Belsar Murrum Quarry — environmental approval granted, 6.6 km away
- Belsar Murum Mine — environmental approval granted, 6.6 km away
- Belsar Murrum Quarry — lapsed, 6.6 km away
- Kaalbarad Stone Quarry — environmental approval granted, 6.8 km away
- Nandgaon Stone Quarry — environmental approval granted, 8.9 km away
More from Himmat Sisodia in West Nimar
- Sulgaon Sand Quarry — lapsed
- Bhasunda Sand Quarry (Khodu-Bharu) — lapsed
- Sulgaon Sand Quarry — not approved
- Badgaon (1) Sand Quarry- (Khodu-Bharu) — environmental approval granted
- Bhasunda Sand Quarry (Khasra No. 49) — lapsed
- Umarkhali – Sand Quarry — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.