Project details
| Status | Not approved |
|---|---|
| Status since | 5 Nov 2026 |
| Application filed | 30 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Trilok Chandra Jaiswal |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Panwa |
| Taluk / tehsil | Gandhwani |
| District | Dhar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07333 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Apr 2026 | Lapsed | 7.4 acres | ₹75 lakh |
| New project filed 30 Sept 2025 (this page) | Not approved | 7.4 acres | ₹75 lakh |
In context
364 applications in Dhar since January 2022 are in the same category (Mining): 203 approved, 35 filed or under review, and 126 withdrawn, lapsed or rejected. The approved ones took a median of 30 days from filing to approval. At 7.4 acres, this one is smaller than 57% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Panwa, Gandhwani, Dhar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Paanwa Stone (Gitti) Quarry — lapsed, 0 m away
- Dedli B Limestone Block (ML Area: 445.748 ha) with Limestone Production… — cleared for impact study, 2.2 km away
- Kosdana Limestone Mine — environmental approval granted, 4.7 km away
- Amended Bharat Net Project BSNL/Linear UG OFC Laying in Nalcha, Sardarpur… — lapsed, 6 km away
- Amended Bharat Net Project BSNL/Linear UG OFC Laying in Nalcha , Dahi and… — forest land use approved, 6.7 km away
- M/s Ramka Mining Pvt. Ltd. ( Banki Sand Mine Area-5.782 ha ) — environmental approval granted, 7.1 km away
- M/s Ramka Mining Pvt. Ltd. ( Banki Sand Mine Area-5.782 ha ) — cleared for impact study, 7.1 km away
- Kukshi Micro Lift Irrigation Project — cleared for impact study, 8.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.