Project details
| Status | Lapsed |
|---|---|
| Status since | 24 May 2025 |
| Application filed | 24 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Hardeep Singh |
| Land area | 5.6 acres (2.3 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Champaner |
| Taluk / tehsil | Goharganj |
| District | Raisen |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07467 |
In context
244 applications in Raisen since January 2022 are in the same category (Mining): 149 approved, 40 filed or under review, and 55 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 5.6 acres, this one is smaller than 69% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Champaner, Goharganj, Raisen, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Champaner Stone Crusher — lapsed, 1.1 km away
- Champaner Crusher Stone Quarry — lapsed, 1.3 km away
- Champaner Crusher Stone Quarry — under environmental review, 1.3 km away
- Champaner Stone Quarry — lapsed, 1.4 km away
- Project by Inframan Ventures LLP — under wildlife review, 1.7 km away
- Project by Inframan Ventures LLP — under wildlife review, 1.7 km away
- Project by Flowman Metrix Private Limited — under wildlife review, 1.8 km away
- Project by Flowman Metrix Private Limited — under wildlife review, 1.8 km away
More from Hardeep Singh in Raisen
- Champaner Crusher Stone Quarry — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.