One of 2 filings for this project. The project's main page, with every filing and where each stands: Bihara Laterite Deposit
Project details
| Status | Under environmental review |
|---|---|
| Status since | 22 Oct 2026 |
| Application filed | 21 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Tejpal Singh |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Bihara |
| Taluk / tehsil | Kotar |
| District | Satna |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07796 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Oct 2026 (this page) | Under environmental review | 4 acres | ₹40 lakh |
| Early planning filed 2 May 2025 | Cleared for impact study | 4 acres | ₹40 lakh |
In context
206 applications in Satna since January 2022 are in the same category (Mining): 105 approved, 29 filed or under review, and 72 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4 acres, this one is smaller than 88% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 37.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Bihara, Kotar, Satna, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bihara Laterite Deposit — cleared for impact study, 0 m away
- Nimha Laterite Mine — lapsed, 100 m away
- Nimha Laterite Mine — under environmental review, 200 m away
- Bihara Laterite Mine — under environmental review, 600 m away
- Bihara Laterite Mine — cleared for impact study, 600 m away
- Chitgarh Laterite Mine — cleared for impact study, 750 m away
- Nimha Laterite Deposit Project — cleared for impact study, 800 m away
- Biraha Laterite Mine — cleared for impact study, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.