Quick answers
What is Rewa Off-Stream Closed Loop Pumped Storage Project?
Rewa Off-Stream Closed Loop Pumped Storage Project is a proposed water and irrigation project in Bajara, Teonthar, Rewa, Madhya Pradesh. The site covers 4,512.8 acres.
Who is building it?
The applicant is Dhakara Energy Psp Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 20 Jul 2026), as of 27 Nov 2026.
Where is it?
In Bajara, Teonthar, Rewa, Madhya Pradesh.
How big is it?
It has a stated cost of ₹3,759.3 crore and a site of 4,512.8 acres.
When was it filed?
The application was filed on 22 Jun 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 20 Jul 2026 |
| Application filed | 22 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Water & irrigation |
| Applicant | Dhakara Energy Psp Private Limited |
| Land area | 4,512.8 acres (1,826.3 ha) |
| Project cost | ₹3,759.3 crore |
| Village / locality | Bajara |
| Taluk / tehsil | Teonthar |
| District | Rewa |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07822 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 22 Jun 2026 (this page) | Cleared for impact study | 4,512.8 acres | ₹3,759.3 crore |
| Early planning filed 18 Aug 2025 | Returned to applicant | 4,512.8 acres | ₹3,759.3 crore |
In context
12 applications in Rewa since January 2022 are in the same category (Water & irrigation): 6 approved, 6 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4,512.8 acres, this one is larger than 50% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bajara, Teonthar, Rewa, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rewa Off-Stream Closed Loop Pumped Storage Project — returned to applicant, 0 m away
- Rewa Pumped Storage Project — cleared for impact study, 200 m away
- Village Gauri to Bari Chaura 33 KV Sub Transmission Line — forest land use approved, 2.9 km away
- Shankarpur Stone Quarry — lapsed, 7.3 km away
- Mahewa Stone Mine — lapsed, 10.6 km away
- Mahewa Stone Mine — lapsed, 10.6 km away
- Mahewa Stone Mine — lapsed, 10.7 km away
- Mahewa Stone Mine — lapsed, 10.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.