Quick answers
What is this project?
Factory Shed Construction for Printed Circuit Board Manufacturing Plant is a proposed building project in Bariyakheri, Sehore, Madhya Pradesh. The site covers 5.3 acres.
Who is building it?
The applicant is Secure Circuits Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Bariyakheri, Sehore, Madhya Pradesh.
How big is it?
It has a stated cost of ₹160 crore and a site of 5.3 acres.
When was it filed?
The application was filed on 21 Jul 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 14 Nov 2026 |
| Application filed | 21 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Secure Circuits Limited |
| Land area | 5.3 acres (2.2 ha) |
| Project cost | ₹160 crore |
| Village / locality | Bariyakheri |
| Taluk / tehsil | Sehore |
| District | Sehore |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-07977 |
In context
6 applications in Sehore since January 2022 are in the same category (Buildings & townships): 2 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bariyakheri, Sehore, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Barley Malt Manufacturing Unit (Food Processing Industry)(Malteries Without… — under environmental review, 950 m away
- Industrial Shed at M/s CG Power and Industrial Solutions Limited, MPIDC… — environmental approval granted, 1.8 km away
- Industrial Shed at CG Power and Industrial Solutions Limited, MPIDC Industrial… — lapsed, 1.8 km away
- Hasnabad Murum Quarry — environmental approval granted, 4.7 km away
- Hasnabad Crusher Stone (Gitti) Quarry — environmental approval granted, 4.8 km away
- Kasba Stone Quarry of Smt. Roli Gupta — cleared for impact study, 4.8 km away
- Kasba Crusher Stone Quarry — lapsed, 5 km away
- Rafiqganj Murrum Quarry — lapsed, 5.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.