Project details
| Status | Initial checks |
|---|---|
| Status since | 8 Sept 2026 |
| Application filed | 8 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | M/S Zircon Advance Fuels PVT. LTD. |
| Use | Industrial |
| Height | 50 m |
| Land area | 29.1 acres (11.8 ha) |
| Project cost | ₹304.1 crore |
| Village / locality | Kundla Agar |
| Taluk / tehsil | Agar |
| District | Agar Malwa |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08026 |
In context
5 applications in Agar Malwa since January 2022 are in the same category (Buildings & townships): 1 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kundla Agar, Agar, Agar Malwa, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Parsukhedi Stone and Murram Quarry; Quarry Lease Area- 3.99 ha, Production… — under environmental review, 2.5 km away
- Parsukhedi Stone and Murram Quarry; Quarry Lease Area- 3.99 ha, Production… — cleared for impact study, 2.5 km away
- Kasba Agar Stone Quarry — cleared for impact study, 2.9 km away
- Kasba Agar Stone Quarry — lapsed, 2.9 km away
- Kasba Agar Stone Quarry ; Quarry Lease Area- 3.970 ha, Production… — lapsed, 3.1 km away
- Kasba Agar Stone Quarry ; Quarry Lease Area- 3.970 ha, Production… — cleared for impact study, 3.1 km away
- Kasba Agar Stone Quarry — lapsed, 3.2 km away
- Kasba Agar Stone Quarry — under environmental review, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.