Quick answers
What is Shivni Pump Storage Project?
Shivni Pump Storage Project is a proposed water and irrigation project in Pati Reserved Forest, Pati, Barwani, Madhya Pradesh. The site covers 2,467.1 acres.
Who is building it?
The applicant is Adani Renewable Energy Fifty Two Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Pati Reserved Forest, Pati, Barwani, Madhya Pradesh.
How big is it?
It has a stated cost of ₹7,526.9 crore and a site of 2,467.1 acres.
When was it filed?
The application was filed on 16 Sept 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 22 Oct 2026 |
| Application filed | 16 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Adani Renewable Energy Fifty Two Limited |
| Land area | 2,467.1 acres (998.4 ha) |
| Project cost | ₹7,526.9 crore |
| Village / locality | Pati Reserved Forest |
| Taluk / tehsil | Pati |
| District | Barwani |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08060 |
In context
11 applications in Barwani since January 2022 are in the same category (Water & irrigation): 5 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 2,467.1 acres, this one is larger than 73% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pati Reserved Forest, Pati, Barwani, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road Piparkund Village-Renkufaliya to Amli Towards Suwalal's House to Tehsil… — forest land use approved, 1.3 km away
- Road on Bokrata-Khetiya Road from Indalbada to Manjni Tehsil towards Devgarh… — forest land use approved, 7 km away
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved, 8.2 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved, 9.6 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed, 11.8 km away
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — forest land use approved, 13.8 km away
- Jio Digital Fiber Pvt. Ltd. Linear OFC 5G Project In Row Corridor Of Principal… — lapsed, 15.2 km away
- Diversion of Additional forest land falling in Sardar Sarovar Project — more information requested, 17 km away