Industrial Park - Cheetakheda is a proposed township project in Kardriya, Jiran, Neemuch, Madhya Pradesh. The site covers 311.7 acres. Its stated project cost is ₹99.6 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 23 May 2026).

See it on the live map All projects in Neemuch

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Industrial Park - Cheetakheda?

Industrial Park - Cheetakheda is a proposed township project in Kardriya, Jiran, Neemuch, Madhya Pradesh. The site covers 311.7 acres.

Who is building it?

The applicant is MP Industrial Development Corportion Ltd..

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Kardriya, Jiran, Neemuch, Madhya Pradesh.

How big is it?

It has a stated cost of ₹99.6 crore and a site of 311.7 acres.

When was it filed?

The application was filed on 3 May 2026.

Project details

Official titleDevelopment of Industrial Park - Cheetakheda at Village - Cheetakheda, Keri, Gwaldevia, Karadiya Maharaj, Tehsil - Jeeran, District- Neemuch, Madhya Pradesh – 458336 by Madhya Pradesh Industrial Development Corporation Ltd. (MPIDC)
StatusUnder environmental review
Status since23 May 2026
Application filed3 May 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantMP Industrial Development Corportion Ltd.
UseTownship
Land area311.7 acres (126.2 ha)
Plot area12,61,530 m² (1,35,78,983 sq ft)
Project cost₹99.6 crore
Village / localityKardriya
Taluk / tehsilJiran
DistrictNeemuch
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-08069

What the filings say

The Madhya Pradesh Industrial Development Corporation Ltd. (MPIDC) proposes to develop a greenfield industrial park across 126.15 hectares (311.72 acres) in the Neemuch district. The project report states that 16.00 hectares of the total plot area is currently under encroachment, resulting in a net planning area of 110.15 hectares (272.18 acres). The park is intended to anchor a diversified industrial cluster including chemical, paper, engineering, textile, and agro-based industries.

What is planned

The industrial park is designed to accommodate various industrial, residential, and commercial components. The core development consists of 45.98 hectares for industrial plots and 15.85 hectares for Micro, Small and Medium Enterprises (MSME) industrial plots.

Infrastructure components include:

The construction phase will involve building a boundary wall, security posts, an electricity substation, and laying power lines and street lighting. The permissible Floor Area Ratio (FAR) for the project is 1.75 times the plot area.

Layout and design

The layout is divided into three sectors: Sector-A, Sector-B, and Sector-C. Sector-A occupies the southern portion, Sector-B is in the central area, and Sector-C is located to the north. A 30-metre wide approach road is planned, with internal roads of 30m, 24m, and 18m widths. The design maintains a minimum road carriageway of 7 metres. Four parking parcels are distributed across the different sectors.

Land and surroundings

The site is located in a relatively plain region with elevations ranging from 480m to 514m above mean sea level. It is surrounded by agricultural areas and villages. Karadiya Maharaj village is located 1.7 km to the east, while Cheetakheda village is adjacent to the southern boundary. A dense scrub protected forest is situated 1.8 km southwest of the site. The Rajasthan-Madhya Pradesh state boundary is approximately 1 km from the project site in the west-northwest direction.

Water, power and access

Water: During the operational phase, the total water requirement is estimated at 3,341 kilolitres per day (KLD). Fresh water of 1,821 KLD will be sourced from the Industrial Area Jhanjharwada, which receives water from the Thikariya Dam. The remaining 1,520 KLD will be met through recycled water from an on-site Sewage Treatment Plant (STP) and Common Effluent Treatment Plant (CETP). For the construction phase, 119 KLD will be required.

Power: The total power requirement is approximately 25 MVA, to be provided by Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Ltd. A 125 KVA diesel generator set will be maintained for essential services.

Access: The site is connected via the Cheetakheda-Neemuch road. National Highway 156 is 8.5 km to the east, and State Highway 15 is 7 km to the north. The nearest railway station is Harkiyakhal, approximately 8.7 km away.

Environmental safeguards

The project includes a 1,000 KLD STP for domestic sewage and a 1 MLD (million litres per day) CETP with Zero Liquid Discharge (ZLD) for industrial effluent. No treated or untreated wastewater is to be discharged outside the park premises.

For water conservation, 104 rainwater harvesting pits are planned with a cumulative capacity of 9,027 cubic metres. A greenbelt of 11.08 hectares (10.06% of the net planning area) will be developed along the boundaries and roadsides, with a target of 2,500 trees per hectare. Solid waste management includes an Organic Waste Converter (OWC) for biodegradable waste, while industrial hazardous waste will be sent to common treatment and disposal facilities.

Timeline

The applicant estimates that the construction phase will employ approximately 200 local labourers. During the operational phase, the park is expected to provide employment for approximately 19,966 persons.

Industrial Park - Cheetakheda site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Industrial Park - Cheetakheda: Detailed layout plan: Sectors A, B, and C with industrial plots and utilities (preview)🔒 Sign in free to see it
Detailed layout plan: Sectors A, B, and C with industrial plots and utilities
Industrial Park - Cheetakheda: Master layout map showing sector divisions and internal road network (preview)🔒 Sign in free to see it
Master layout map showing sector divisions and internal road network
Industrial Park - Cheetakheda: Connectivity map: Proximity to Neemuch Airport and Harkiyakhal station (preview)🔒 Sign in free to see it
Connectivity map: Proximity to Neemuch Airport and Harkiyakhal station
Industrial Park - Cheetakheda: Google Earth view of the project site boundary and surrounding villages (preview)🔒 Sign in free to see it
Google Earth view of the project site boundary and surrounding villages

In context

5 applications in Neemuch since January 2022 are in the same category (Buildings & townships): 3 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kardriya, Jiran, Neemuch, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 11 MP Industrial Development projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.