Quick answers
What is Kanheria Stone (Gitti) and M-Sand Quarry?
Kanheria Stone (Gitti) and M-Sand Quarry is a proposed mining project in Kanheriya, Tonk Khurd, Dewas, Madhya Pradesh. The site covers 9.9 acres.
Who is building it?
The applicant is Shri Kiran Infrastructure.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 18 Nov 2026), as of 27 Nov 2026.
Where is it?
In Kanheriya, Tonk Khurd, Dewas, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1.4 crore and a site of 9.9 acres.
When was it filed?
The application was filed on 16 Oct 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 16 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shri Kiran Infrastructure |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Kanheriya |
| Taluk / tehsil | Tonk Khurd |
| District | Dewas |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08103 |
In context
215 applications in Dewas since January 2022 are in the same category (Mining): 103 approved, 47 filed or under review, and 65 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 9.9 acres, this one is larger than 55% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 34.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
Kanheriya, Tonk Khurd, Dewas, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kanheriya Stone Quarry — not approved, 0 m away
- Kanheriya Stone (Gitti) Quarry — lapsed, 0 m away
- Kanheria Murram & Stone (Gitti and M-sand) Quarry — cleared for impact study, 200 m away
- Kanheria Stone Quarry — cleared for impact study, 200 m away
- Kanheriya M-Sand Quarry — under environmental review, 200 m away
- Kanheria Stone Quarry — cleared for impact study, 400 m away
- Kanheria Stone Quarry — lapsed, 400 m away
- Kanheriya Stone (Gitti) Murrum & M Sand Quarry — under environmental review, 750 m away
More from Shri Kiran Infrastructure in Dewas
- Kanheriya M-Sand Quarry — under environmental review
- Kanheriya Stone Quarry — not approved
- Kanheriya Stone (Gitti) Quarry — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.