Quick answers
What is this project?
Obtaining Environment clearance for proposed Harrai Pratap Singh Stone Quarry Lease is is a proposed mining project in Harrai, Hanumana, Rewa, Madhya Pradesh. The site covers 5.3 acres.
Who is building it?
The applicant is Prem Shankar Dubey.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Harrai, Hanumana, Rewa, Madhya Pradesh.
How big is it?
It has a stated cost of ₹98 lakh and a site of 5.3 acres.
When was it filed?
The application was filed on 3 Jul 2026.
Project details
| Official title | Obtaining Environment clearance for proposed Harrai Pratap Singh Stone Quarry Lease is located at Village – Harrai Pratap Singh, Tehsil – Hanumana, District – Mauganj (M.P.),with production of ROM 23205 cum per year (Stone/Gitti = 20,349 m3/Year, 357m3 per year of soil, 1428 m3 per year of overburden and 1071m3/year of mineral reject) by M/s Dev Stone Mining and Construction, Prop. Shri Prem Shankar Dubey |
|---|---|
| Status | Under environmental review |
| Status since | 18 Nov 2026 |
| Application filed | 3 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Prem Shankar Dubey |
| Land area | 5.3 acres (2.2 ha) |
| Project cost | ₹98 lakh |
| Village / locality | Harrai |
| Taluk / tehsil | Hanumana |
| District | Rewa |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08192 |
In context
177 applications in Rewa since January 2022 are in the same category (Mining): 70 approved, 25 filed or under review, and 82 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5.3 acres, this one is larger than 66% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Harrai, Hanumana, Rewa, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Harrai Pratap Singh Stone (Sandstone) Quarry Lease — lapsed, 0 m away
- Sardaman Stone (For making Gitti by Mechanical Crushing) Quarry — under environmental review, 4.8 km away
- Sardaman Stone (For making Gitti by Mechanical Crushing) Quarry — cleared for impact study, 4.8 km away
- Excavation Lease for Mineral Boulder — lapsed, 5.4 km away
- Bhati Jungle Stone (Sand Stone) Quarry Lease — cleared for impact study, 8 km away
- Bhati Jungle Stone Quarry — lapsed, 8 km away
- Bhati Jungle Stone Quarry — lapsed, 8 km away
- Bhati Jungle Quarry Lease — lapsed, 8.2 km away
More from Prem Shankar Dubey in Rewa
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.