Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 18 Jun 2026 |
| Application filed | 25 May 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ajay Kumar Sahu |
| Land area | 8.2 acres (3.3 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Bandol |
| Taluk / tehsil | Seoni |
| District | Seoni |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08439 |
In context
83 applications in Seoni since January 2022 are in the same category (Mining): 44 approved, 8 filed or under review, and 31 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 8.2 acres, this one is smaller than 52% of them.
No other mining lease on record is within 500 m of this site; 16 have applied within 5 km.
Where it is
Bandol, Seoni, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Narayanganj Crusher Stone Quarry, Production: 16,530 Cubic meter per year — cleared for impact study, 2 km away
- Kuklah Stone Quarry — under environmental review, 2.1 km away
- Kuklah Stone Quarry — cleared for impact study, 2.1 km away
- Kuklah Stone Quarry — lapsed, 2.1 km away
- Narayanganj Crusher Stone Quarry — cleared for impact study, 2.2 km away
- Aloniya Crusher Stone Quarry — lapsed, 2.2 km away
- Banki Stone Quarry Lease — lapsed, 2.3 km away
- Gangerua Crusher Stone Quarry — environmental approval granted, 2.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.