Quick answers
What is this project?
Proposed Common Bio-Medical Waste Treatment Facility at Survey No. 139/2, Ward -14, Near Trenching Ground Nagarpalika, Raghogarh, Village: Dongar, Tehsil Raghogarh, Dist : Guna (M.P.) – 473001 is a proposed waste management project in Dongar, Raghogarh, Guna, Madhya Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Vishwajeet Singh Chauhan.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 30 May 2026), as of 27 Nov 2026.
Where is it?
In Dongar, Raghogarh, Guna, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 18 Mar 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 30 May 2026 |
| Application filed | 18 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Vishwajeet Singh Chauhan |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Dongar |
| Taluk / tehsil | Raghogarh |
| District | Guna |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08466 |
In context
5 applications in Guna since January 2022 are in the same category (Waste management): 2 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dongar, Raghogarh, Guna, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ikodiya Belka Sand Quarry — environmental approval granted, 3.9 km away
- Bhamavad Sand Quarry — environmental approval granted, 4.2 km away
- Chainpura Crusher Stone Quarry — lapsed, 4.4 km away
- Allipura Stone Quarry — environmental approval granted, 4.4 km away
- Allipura Stone Quarry — environmental approval granted, 4.6 km away
- Kolua Maidani Murrum Quarry — environmental approval granted, 4.7 km away
- Constrcution of Railine Section Km 0+000 to 1+600 (New Railline 0+000 to 1+600… — forest land use approved, 5 km away
- 11 KV Ahirkhedi Abadi feeder under RDSS Feeder Sepereation — lapsed, 6.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.