Quick answers
What is this project?
No Increase in Pollution Load due to proposed change in product mix with expansion in the same category (Fuel Ethanol) as per EIA Notification 23rd November 2016 as amended till date for Fuel Ethanol Unit of M/s Crescendo Industries Private Limited at 38/1/1 S, Village Mahewa, Tehsil Teonthar, District Rewa, M.P. 486001 is a proposed industrial building project in Mahewa, Teonthar, Rewa, Madhya Pradesh. The site covers 18.8 acres.
Who is building it?
The applicant is Crescendo Industries Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Mahewa, Teonthar, Rewa, Madhya Pradesh.
How big is it?
It has a stated cost of ₹183.4 crore and a site of 18.8 acres.
When was it filed?
The application was filed on 10 Sept 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 10 Sept 2026 |
| Application filed | 10 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Crescendo Industries Private Limited |
| Use | Industrial |
| Height | 36 m |
| Land area | 18.8 acres (7.6 ha) |
| Project cost | ₹183.4 crore |
| Village / locality | Mahewa |
| Taluk / tehsil | Teonthar |
| District | Rewa |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08605 |
In context
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahewa, Teonthar, Rewa, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Project of 120 KLPD Grain Based Ethanol Plant — environmental approval granted, 0 m away
- Mahewa Stone Mine — lapsed, 600 m away
- Mahewa Stone Quarry — lapsed, 600 m away
- Mahewa Stone Mine — lapsed, 700 m away
- Mahewa Stone Quarry — lapsed, 700 m away
- Mahewa Stone Mine — lapsed, 800 m away
- Mahewa Stone Mine — lapsed, 1.2 km away
- Mahewa Stone Mine — lapsed, 1.4 km away
More from Crescendo Industries Private Limited in Rewa
- Greenfield Project of 120 KLPD Grain Based Ethanol Plant — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.