Quick answers
What is Palduna Murram Quarry?
Palduna Murram Quarry is a lapsed mining project in Palduna, Ratlam, Madhya Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Sanjay Rathod.
Has it been approved?
No. The application was lapsed on 20 Nov 2026, so it is no longer under consideration.
Where is it?
In Palduna, Ratlam, Madhya Pradesh.
How big is it?
It has a stated cost of ₹35 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 14 May 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 14 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sanjay Rathod |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Palduna |
| Taluk / tehsil | Ratlam |
| District | Ratlam |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08717 |
In context
261 applications in Ratlam since January 2022 are in the same category (Mining): 143 approved, 45 filed or under review, and 73 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is smaller than 69% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Palduna, Ratlam, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Naugawankalan Murram Quarry — lapsed, 3.4 km away
- Naogavakalan Murrum Quarry — environmental approval granted, 3.5 km away
- Naugawakalan Murrum Quarry — under environmental review, 3.6 km away
- Naugawakalan Murrum Quarry — cleared for impact study, 3.6 km away
- Naugawakala Murrum Quarry — under environmental review, 3.8 km away
- Naugawakala Murrum Quarry — more information requested, 3.8 km away
- Naugawankalan Murrum Quarry — environmental approval granted, 3.8 km away
- Naugawankalan Murrum Quarry — under environmental review, 3.8 km away
More from Sanjay Rathod in Ratlam
- Jeevangarh Crusher Stone Deposit — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.