Quick answers
What is this project?
Sawaliyarundi Stone Quarry with proposed production capacity of 19,000m3/year stone of Ku. Payal Binnen D/o Shri Vyanktesh Timanna is an approved mining project in Sanwalyarandi, Ratlam, Madhya Pradesh. The site covers 9.9 acres.
Who is building it?
The applicant is Payal Binnen.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Sept 2026), as of 27 Nov 2026.
Where is it?
In Sanwalyarandi, Ratlam, Madhya Pradesh.
How big is it?
It has a stated cost of ₹65 lakh and a site of 9.9 acres.
When was it filed?
The application was filed on 29 Apr 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Sept 2026 |
| Application filed | 29 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Payal Binnen |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹65 lakh |
| Village / locality | Sanwalyarandi |
| Taluk / tehsil | Ratlam |
| District | Ratlam |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08774 |
In context
261 applications in Ratlam since January 2022 are in the same category (Mining): 143 approved, 45 filed or under review, and 73 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9.9 acres, this one is larger than 81% of them.
7 other mining leases have applied within 500 m of this site; together with this one they cover 54.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 39 mining leases have applied within 5 km.
Where it is
Sanwalyarandi, Ratlam, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sanwaliyarundi Stone Quarry — cleared for impact study, 250 m away
- Sanwaliyarundi Stone Quarry — environmental approval granted, 250 m away
- Sanwliya Rundi Stone (Gitti & M-Sand) Quarry — under environmental review, 300 m away
- Crusher Stone Quarry Project — under environmental review, 300 m away
- Crusher Stone Quarry Project — cleared for impact study, 300 m away
- Sanwaliya Rundi Stone (Gitti) & M-Sand Quarry — cleared for impact study, 350 m away
- Sanwaliyarundi Stone Quarry — lapsed, 350 m away
- Sanwaliyarundi Stone Quarry — cleared for impact study, 350 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.