One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Rail Coach Factory Project at Plot/Phase No. 123, 204/1 and 205, Village…
Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Oct 2026 |
| Application filed | 23 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Beml Limited |
| Land area | 148.4 acres (60.1 ha) |
| Project cost | ₹9 crore |
| Village / locality | Umariya |
| Taluk / tehsil | Goharganj |
| District | Raisen |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08884 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Oct 2026 | Under environmental review | 148.4 acres | ₹9 crore |
| Early planning filed 23 Sept 2026 (this page) | Lapsed | 148.4 acres | ₹9 crore |
In context
12 applications in Raisen since January 2022 are in the same category (Buildings & townships): 1 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Umariya, Goharganj, Raisen, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Rail Coach Factory Project at Plot/Phase No. 123, 204/1 and 205… — lapsed, 0 m away
- Proposed Rail Coach Factory Project at Plot/Phase No. 123, 204/1 and 205,… — under environmental review, 0 m away
- Umariya Soil Quarry — environmental approval granted, 550 m away
- Manufacturing of Synthetic Organic Chemical Products — cleared for impact study, 4.7 km away
- Water Supply Scheme Plastic Park Tamot — lapsed, 5.9 km away
- Dhabla Soil Quarry — lapsed, 6.9 km away
- Barna Dam Multi Village Drinking Water Supply Scheme, District Raisen in the… — decision issued, 7.5 km away
- Water Supply Scheme for Plastic Park Tamot From Ratapani Dam — more information requested, 7.7 km away
More from Beml Limited in Raisen
All 3 Beml projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.