Project details
| Official title | Proposed Construction of Housing Project Under PMAY "Arawali Hills" by Indore Municipal Corporation |
|---|---|
| Status | More information requested |
| Status since | 30 Sept 2026 |
| Application filed | 7 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Accounts Officer Municipal Corporation Indore |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹77.5 crore |
| Village / locality | Bhichaulihapsi |
| Taluk / tehsil | Indore |
| District | Indore |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08984 |
In context
81 applications in Indore since January 2022 are in the same category (Buildings & townships): 48 approved, 22 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.7 acres, this one is smaller than 62% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhichaulihapsi, Indore, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential Building Project Under PMAY "Aravalli Parisar" — cleared for impact study, 350 m away
- Commercial Cum Residential Project " Sahil Columbia" by True Mart — environmental approval granted, 800 m away
- Proposed Construction of Residential Project "Emerald Horizon Tower" — environmental approval granted, 1.3 km away
- Residential Multi-flatted Dwelling Unit "Sanjana Imperial" by Darpan Farms and… — environmental approval granted, 1.6 km away
- Residential Multi Dwelling Unit "Verolux24 by Tirumala" — under environmental review, 2.1 km away
- Mpm the First — lapsed, 2.3 km away
- Proposed Construction of "CLIFFTON PALLADIUM" by Vertical Homes LLP — environmental approval granted, 2.6 km away
- Residential Project "Juniper Prospera "by Trinesh Infra LLP — under environmental review, 2.8 km away
More from Accounts Officer Municipal Corporation Indore in Indore
- Proposed Multi Dwelling Units "Housing for All Under PMAY 2.0" — initial checks
- Proposed Multi Dwelling Units "Housing for All Under PMAY 2.0 -Tapti Parisar… — under environmental review
- Proposed Multi Dwelling Units "Housing for All Under PMAY 2.0 Tapti Parisar… — withdrawn
- Multi Dwelling Units (Housing for all under Pradhan Mantri Awas Yojna (PMAY… — initial checks
- Indore Water Supply AMRUT 2.0 (Package-II) — more information requested
- Amrut 2.0 — lapsed
9 Accounts Officer Municipal Corporation Indore projects in Indore
All 10 Accounts Officer Municipal Corporation Indore projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.