What is Developing? Open the mapMap

LapsedMining · Jabalpur, Madhya Pradesh

Obtaining EC for Hridaynagar Laterite and Clay Mine (20.00 ha.) with ROM capacity of 192501.5 Tonne per annum (Laterite – 150001.20 T, Clay – 5000.60, OB/waste – 37500.3 T, village – Hridaynagar, Tehsil – Sihora, Dist. – Jabalpur (M.P).

Obtaining EC for Hridaynagar Laterite and Clay Mine (20.00 ha.) with ROM capacity of 192501.5 Tonne per annum (Laterite – 150001.20 T, Clay – 5000.60, OB/waste – 37500.3 T, village – Hridaynagar, Tehsil – Sihora, Dist. – Jabalpur (M.P) is a lapsed mining project in Hirdyanagar, Sihora, Jabalpur, Madhya Pradesh. The site covers 49.4 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 6 Sept 2026).

See it on the live map All projects in Jabalpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Obtaining EC for Hridaynagar Laterite and Clay Mine (20.00 ha.) with ROM capacity of 192501.5 Tonne per annum (Laterite – 150001.20 T, Clay – 5000.60, OB/waste – 37500.3 T, village – Hridaynagar, Tehsil – Sihora, Dist. – Jabalpur (M.P) is a lapsed mining project in Hirdyanagar, Sihora, Jabalpur, Madhya Pradesh. The site covers 49.4 acres.

Who is building it?

The applicant is Mamta Bhargava.

Has it been approved?

No. The application was lapsed on 6 Sept 2026, so it is no longer under consideration.

Where is it?

In Hirdyanagar, Sihora, Jabalpur, Madhya Pradesh.

How big is it?

It has a stated cost of ₹50 lakh and a site of 49.4 acres.

When was it filed?

The application was filed on 6 Aug 2026.

Project details

StatusLapsed
Status since6 Sept 2026
Application filed6 Aug 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantMamta Bhargava
Land area49.4 acres (20 ha)
Project cost₹50 lakh
Village / localityHirdyanagar
Taluk / tehsilSihora
DistrictJabalpur
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-09127

In context

322 applications in Jabalpur since January 2022 are in the same category (Mining): 178 approved, 41 filed or under review, and 103 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 49.4 acres, this one is larger than 99% of them.

No other mining lease on record is within 500 m of this site; 16 have applied within 5 km.

Where it is

Hirdyanagar, Sihora, Jabalpur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Mamta Bhargava in Jabalpur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.