Quick answers
What is this project?
1.1 GW Solar Cell Manufacturing Unit at Plot No. 10, Mohasa Babai Phase II, Madhya Pradesh Industrial Development Corporation, Village: Bajjarwada, Tehsil: Makhan Nagar, Narmadapuram, Madhya Pradesh is a proposed building project in Debari, Girwa, Udaipur, Madhya Pradesh. The site covers 13.2 acres.
Who is building it?
The applicant is Cosmic Pv Power Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Debari, Girwa, Udaipur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹500 crore and a site of 13.2 acres.
When was it filed?
The application was filed on 24 Jun 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 24 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Cosmic Pv Power Limited |
| Land area | 13.2 acres (5.4 ha) |
| Project cost | ₹500 crore |
| Village / locality | Debari |
| Taluk / tehsil | Girwa |
| District | Udaipur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09156 |
Where it is
Debari, Girwa, Udaipur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.