Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Jun 2024 |
| Application filed | 24 Feb 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Sunil Keshri |
| Forest land | 600 m² |
| Project cost | ₹2 lakh |
| Village / locality | Dahinala |
| Taluk / tehsil | Nepanagar |
| District | Burhanpur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09160 |
In context
12 applications in Burhanpur since January 2022 are in the same category (Telecom): 2 approved, 1 filed or under review, and 9 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dahinala, Nepanagar, Burhanpur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Optical Fibre Cable Laying and associated work for 4G Mobile Saturation… — lapsed, 2.8 km away
- Diversion of Forest Land for the Construction of 3rd & 4th Bg Rail Line From… — more information requested, 3.1 km away
- Road on Forest Asirgarh Land area from Km.153+900 to Km. 154+600 (750 mtr… — forest land use approved, 3.7 km away
- New 11 KV line from 33/11 KV Substation to Police Station — withdrawn, 5.5 km away
- New 11 KV Line from Asirgarh P.S to New S/S — lapsed, 5.5 km away
- Diversion of 0.0358 Ha of Forest Land for Construction of Mobile Tower — lapsed, 9.2 km away
- Diversion of 0.0179 Ha of Forest Land for Construction of Mobile Tower at… — lapsed, 10 km away
- New 11 KV Line from Matapur to Chandani — lapsed, 10.2 km away
More from Sunil Keshri in Burhanpur
- 4g Saturation Bsnl Tower Village Chhoti Sukta — lapsed
- Optical Fibre Cable Laying and associated work for 4G Mobile Saturation… — lapsed
- :- Optical Fibre Cable Laying and associated work for 4G Mobile Saturation… — lapsed
- Optical Fibre Cable Laying and associated work for 4G Mobile Saturation… — lapsed
About this information