Quick answers
What is this project?
Kanjarda Transmission Line under PM KUSUM-C Scheme Power from Kanjarda SPP is a proposed power project in Chikli, Jawad, Neemuch, Madhya Pradesh. The site covers 1,365.1 acres.
Who is building it?
The applicant is Raghvendra Singh.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Chikli, Jawad, Neemuch, Madhya Pradesh.
How big is it?
It has a stated cost of ₹29.7 crore; a site of 1,365.1 acres and 1.9 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 5 Jan 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 20 Feb 2025 |
| Application filed | 5 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Raghvendra Singh |
| Land area | 1,365.1 acres (552.4 ha) |
| Forest land | 1.9 acres (0.8 ha) |
| Project cost | ₹29.7 crore |
| Village / locality | Chikli |
| Taluk / tehsil | Jawad |
| District | Neemuch |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09187 |
In context
15 applications in Neemuch since January 2022 are in the same category (Power): 7 approved, 2 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 14 months from filing to approval. At 1,365.1 acres, this one is smaller than 57% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chikli, Jawad, Neemuch, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bhojpura to Navalpura Road — more information requested, 4.3 km away
- Gandhi Sagar 2 Multi -Villages Scheme, District Mandsaur & Neemuch in Single… — forest land use approved, 4.9 km away
- Gandhi Sagar 2 Multi -Villages Scheme — lapsed, 5.7 km away
- Barkheda to Balakheda Choukdi Road — lapsed, 10.3 km away
- Gandhi Sagar 2 Multi-Villages Scheme — forest land use approved, 11 km away
- Production of semi-refined morphine using Concentrated Poppy Straw Technology — under environmental review, 12.5 km away
- Production of semi-refined morphine using Concentrated Poppy Straw Technology — returned to applicant, 12.5 km away
- Production of semi-refined morphine using Concentrated Poppy Straw Technology — returned to applicant, 12.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.