One of 3 filings for this project. The project's main page, with every filing and where each stands: Jio Digital Fiber Pvt. Ltd. Linear OFC 5G Project In Row Corridor Of Principal Road…
Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Jun 2025 |
| Application filed | 22 Nov 2022 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Jio Digital Fibre Private LTD |
| Land area | 15.5 acres (6.3 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Amarpur |
| Taluk / tehsil | Gyaraspur |
| District | Vidisha |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09224 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Feb 2023 | Lapsed | 15.5 acres | ₹20 lakh |
| Change of use filed 19 Jan 2023 | Lapsed | 15.5 acres | ₹16 lakh |
| Change of use filed 22 Nov 2022 (this page) | Lapsed | 15.5 acres | ₹20 lakh |
In context
22 applications in Vidisha since January 2022 are in the same category (Roads & highways): 2 approved, 10 filed or under review, and 10 withdrawn, lapsed or rejected. At 15.5 acres, this one is larger than 64% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amarpur, Gyaraspur, Vidisha, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jio Digital Fiber Pvt. Ltd. Linear OFC 5G Project In Row Corridor Of Principal… — lapsed, 0 m away
- Jio Digital Fiber Pvt. Ltd. Linear OFC 5G Project In Row Corridor Of Principal… — lapsed, 0 m away
- Jio Digital Fiber Pvt Ltd Ofc 4G USOF Project Gairatganj Headargarh Route DFO… — more information requested, 0 m away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed, 300 m away
- 4g Saturation Project From Kaladfata to Hydergarh — forest land use approved, 8.5 km away
- Chopra 4G Saturation Site BSNL — under forest review, 8.9 km away
- Chopra 4G Saturation Site BSNL — lapsed, 8.9 km away
- Potla Stone quarry (T.P.) — environmental approval granted, 9.5 km away
More from Jio Digital Fibre Private LTD in Vidisha
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — more information requested
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed
10 Jio Digital Fibre projects in Vidisha
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.