What is Developing? Open the mapMap

More information requestedRoads & highways · Shahdol, Madhya Pradesh

Upgradation of Pacage-1: BEOHARI(TETKA MOD) – SHAHDOL ROAD (SH-57) from Design Ch. 111+510 to Design Ch.163+550 Total Length 52.050 Km to Two lane with paved shoulder configuration in the state of Madhya Pradesh

Upgradation of Pacage-1: BEOHARI(TETKA MOD) – SHAHDOL ROAD (SH-57) from Design Ch. 111+510 to Design Ch.163+550 Total Length 52.050 Km to Two lane with paved shoulder configuration in the state of Madhya Pradesh is a proposed road project in Aswari, Sohagpur, Shahdol, Madhya Pradesh. The site covers 119.8 acres. Its stated project cost is ₹359.1 crore. As of 27 Nov 2026, its status is “More information requested” (since 13 Nov 2026).

See it on the live map All projects in Shahdol

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Upgradation of Pacage-1: BEOHARI(TETKA MOD) – SHAHDOL ROAD (SH-57) from Design Ch.…

Project details

StatusMore information requested
Status since13 Nov 2026
Application filed27 May 2025
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantMadhya Pradesh Road Development Corporation Limited Bhopal
Land area119.8 acres (48.5 ha)
Forest land48.3 acres (19.6 ha)
Project cost₹359.1 crore
Village / localityAswari
Taluk / tehsilSohagpur
DistrictShahdol
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-09243

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 19 Jul 2025Under wildlife review119.8 acres₹359.1 crore
New project filed 27 May 2025 (this page)More information requested119.8 acres₹359.1 crore

In context

32 applications in Shahdol since January 2022 are in the same category (Roads & highways): 7 approved, 8 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 119.8 acres, this one is larger than 93% of them.

Where it is

Aswari, Sohagpur, Shahdol, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Madhya Pradesh Road Development Corporation Limited Bhopal in Shahdol

6 Madhya Pradesh Road Development Corporation Limited Bhopal projects in Shahdol
All 8 Madhya Pradesh Road Development Corporation Limited Bhopal projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.