Quick answers
What is Dindori Multi Village Water Supply Scheme?
Dindori Multi Village Water Supply Scheme is a lapsed water and irrigation project in Jhilan, Dindori, Madhya Pradesh. The site covers 15.2 acres.
Who is building it?
The applicant is Madhya Pradesh Jal Nigam Maryadit.
Has it been approved?
No. The application was lapsed on 8 Jul 2025, so it is no longer under consideration.
Where is it?
In Jhilan, Dindori, Madhya Pradesh.
How big is it?
It has a stated cost of ₹12 crore; a site of 15.2 acres and 15.2 acres (6.1 ha) of forest land.
When was it filed?
The application was filed on 25 May 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 8 Jul 2025 |
| Application filed | 25 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Madhya Pradesh Jal Nigam Maryadit |
| Land area | 15.2 acres (6.1 ha) |
| Forest land | 15.2 acres (6.1 ha) |
| Project cost | ₹12 crore |
| Village / locality | Jhilan |
| Taluk / tehsil | Dindori |
| District | Dindori |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09396 |
In context
12 applications in Dindori since January 2022 are in the same category (Water & irrigation): 6 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. At 15.2 acres, this one is smaller than 83% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jhilan, Dindori, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- DINDORI MULTI VILLAGE WATER SUPPLY SCHEME (PIPELINE IN RoW) — forest land use approved, 1.3 km away
- Dindori Multi Village Water Supply Scheme — more information requested, 4.2 km away
- Simariya Metal Stone Quarry, Area 1.0 Ha, Khasra No 217/2, 217/3, 217/4,… — lapsed, 4.3 km away
- Dindori Multi Village Water Supply Scheme (Oht&ips) — forest land use approved, 4.7 km away
- Kunda Mal Crusher Stone Quarry, Area- 1.0 Ha, Khasra No- 537/2, Village- Kunda… — lapsed, 8.4 km away
- Amended Bharat Net/BSNL Linear UG OFC laying Project in Dindori Block, DFO… — forest land use approved, 9.2 km away
- Kohka Mal Stone Quarry, Area 1.0 Ha, at Khasra No 826/2,827/1 Part, Village… — lapsed, 9.3 km away
- Jamuniya Mal Metal Stone Deposit Quarry (3.07 Ha) Khasra No. 852,545, Village-… — lapsed, 9.4 km away
More from Madhya Pradesh Jal Nigam Maryadit in Dindori
- Shahpura Mehandwani Mvs — forest land use approved
- Shahpura Mehandwani Mvs — lapsed
- Shahpura Mehandwani Mvs — lapsed
- Dindori Multi Village Water Supply Scheme — more information requested
- Dindori Multi Village Water Supply Scheme (Oht&ips) — forest land use approved
- DINDORI MULTI VILLAGE WATER SUPPLY SCHEME (PIPELINE IN RoW) — forest land use approved
7 Madhya Pradesh Jal Nigam Maryadit projects in Dindori
All 51 Madhya Pradesh Jal Nigam Maryadit projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.