What is Developing? Open the mapMap

Forest land use approvedRoads & highways · Chhatarpur, Madhya Pradesh

Approach Road for Connectivity to High Level Bridge Across the Dhasan River Imlighat on Nowgong-Baldevgarh Road Km 38/8

Approach Road for Connectivity to High Level Bridge Across the Dhasan River Imlighat on Nowgong-Baldevgarh Road Km 38/8 is an approved road project in Kurra, Chhatarpur, Madhya Pradesh. The site covers 2.4 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 28 Dec 2023).

See it on the live map All projects in Chhatarpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Approach Road for Connectivity to High Level Bridge Across the Dhasan River Imlighat on Nowgong-Baldevgarh Road Km 38/8 is an approved road project in Kurra, Chhatarpur, Madhya Pradesh. The site covers 2.4 acres.

Who is building it?

The applicant is Public Works Department.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 28 Dec 2023), as of 27 Nov 2026.

Where is it?

In Kurra, Chhatarpur, Madhya Pradesh.

How big is it?

It has a stated cost of ₹50 lakh; a site of 2.4 acres and 2.4 acres (1 ha) of forest land.

When was it filed?

The application was filed on 18 Apr 2023.

Project details

Official titleConstruction of Approach Road for Connectivity to High Level Bridge Across the Dhasan River Imlighat on Nowgong-Baldevgarh Road Km 38/8
StatusForest land use approved
Status since28 Dec 2023
Application filed18 Apr 2023
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantPublic Works Department
Land area2.4 acres (1 ha)
Forest land2.4 acres (1 ha)
Project cost₹50 lakh
Village / localityKurra
Taluk / tehsilChhatarpur
DistrictChhatarpur
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-09407

In context

23 applications in Chhatarpur since January 2022 are in the same category (Roads & highways): 6 approved, 10 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 2.4 acres, this one is smaller than 67% of them.

Where it is

Kurra, Chhatarpur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 40 Public Works Department, Madhya Pradesh projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.