Diversion of 36.2503 Ha for Setting Up a Stone Processing Plant, Power House , Transmission Line and Connecting Approach Roads to Alloted Granite Mines

Diversion of 36.2503 Ha for Setting Up a Stone Processing Plant, Power House , Transmission Line and Connecting Approach Roads to Alloted Granite Mines is a proposed road project in Bhitaria, Laundi, Chhatarpur, Madhya Pradesh. The site covers 89.6 acres. Its stated project cost is ₹60 crore. As of 27 Nov 2026, its status is “Under forest review” (since 5 Oct 2026).

See it on the live map All projects in Chhatarpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 36.2503 Ha for Setting Up a Stone Processing Plant, Power House , Transmission Line and Connecting Approach Roads to Alloted Granite Mines is a proposed road project in Bhitaria, Laundi, Chhatarpur, Madhya Pradesh. The site covers 89.6 acres.

Who is building it?

The applicant is Dg Marble.

Has it been approved?

Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.

Where is it?

In Bhitaria, Laundi, Chhatarpur, Madhya Pradesh.

How big is it?

It has a stated cost of ₹60 crore; a site of 89.6 acres and 89.6 acres (36.3 ha) of forest land.

When was it filed?

The application was filed on 17 Sept 2026.

Project details

StatusUnder forest review
Status since5 Oct 2026
Application filed17 Sept 2026
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantDg Marble
Land area89.6 acres (36.3 ha)
Forest land89.6 acres (36.3 ha)
Project cost₹60 crore
Village / localityBhitaria
Taluk / tehsilLaundi
DistrictChhatarpur
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-09444

In context

23 applications in Chhatarpur since January 2022 are in the same category (Roads & highways): 6 approved, 10 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 89.6 acres, this one is larger than 71% of them.

24 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bhitaria, Laundi, Chhatarpur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.