Quick answers
What is Gravel Road?
Gravel Road is a lapsed road project in Bandarwari, Bichhiya, Mandla, Madhya Pradesh. It seeks 4.9 acres of forest land.
Who is building it?
The applicant is Jila Panchayat Mandla.
Has it been approved?
No. The application was lapsed on 23 Oct 2024, so it is no longer under consideration.
Where is it?
In Bandarwari, Bichhiya, Mandla, Madhya Pradesh.
How big is it?
It has a stated cost of ₹40 lakh and 4.9 acres (2 ha) of forest land.
When was it filed?
The application was filed on 5 Aug 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Oct 2024 |
| Application filed | 5 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Jila Panchayat Mandla |
| Forest land | 4.9 acres (2 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Bandarwari |
| Taluk / tehsil | Bichhiya |
| District | Mandla |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09640 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Aug 2024 (this page) | Lapsed | ₹40 lakh | |
| New project filed 25 Jan 2023 | Lapsed | ₹40 lakh |
In context
35 applications in Mandla since January 2022 are in the same category (Roads & highways): 6 approved, 9 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bandarwari, Bichhiya, Mandla, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gravel Road — lapsed, 0 m away
- Rural Road Under PM JANMAN YOJANA Main road Harratola to Magarwada Baigatola — lapsed, 750 m away
- Rural Road Under PM JANMAN YOJANA Main road Harratola to Magarwada Baigatola — more information requested, 750 m away
- Construction/Upgradation of Main Road Harratola to Magarwada Baigatola Totel… — initial checks, 800 m away
- टटमा से मालूमझोला सीमेन्ट कांक्रीट मार्ग लम्बाई ५ कि.मी. by Kanhaiya Dhurwey — lapsed, 1.9 km away
- टटमा से मालूमझोला सीमेन्ट कांक्रीट मार्ग लम्बाई ५ कि.मी. by Kanhaiya Dhurwey — more information requested, 1.9 km away
- BSNL 4G Saturation Project (Mission 500)-Baila 4G Tower — lapsed, 2.4 km away
- BSNL 4G Saturation Project (Mission 500) — lapsed, 3.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.